WEEK 9 (PREPARATION FOR STAKE,FERTILIZER AND LOOSE SOIL)
26May2023
ACTIVITIES
In this week, we are starting with our rollcall at college foodcourt since it was a rainy day,after finish the presentation by batch and reciting Surah al-mulk and Surah al-kahfi we are moving to Bengkel Ladang for the briefing from the lecturer about our course.
the briefing slot from our lecturer
After finish the rollcall, we are moving to our plot for continue our work. We are starting with finished the stake for the long bean plant. By using the branches that has been collect from the last week, We dig a hole by using a hoe and we stick the branches into the hole and we bury back the hole to make sure the branches are stick strong so it might able to support the plant soon. After that, by we are using the raffia rope to tie the branches and also make a way for the plant to creep up.
CHALLENGES
For this week, there doesn't had any challenges. Me and my friends are enjoyed doing our work.
COSTING
In this week, we didn't spent any amount but we might spent some of our money for the next week since it was a special break and we need to pay the worker for watering our plant everyday.
REFLECTION
I'm so happy to see some of my plant and my friend are growth up. I also learn how to make a strongly ties and know the function of soil loosening and also the function of stake. Can't wait to see my plants after this special break on next week !